Monitoring Buried Pipeline
Case Study 21: Monitoring Buried Pipeline
This case study describes a buried operational pipeline in the Middle-East region that was monitored using a GUL Monitoring System. This pipe was known to be at risk of degradation from a localized corrosion mechanism. The monitoring allowed the pipeline operators to ensure the inhibitor dosing was correct and that previously active corrosion was arrested.
![](https://www.guided-ultrasonics.com/wp-content/uploads/2023/04/View_2_blurred_cropped_rotated-650x440.png)