Case Study 21: Monitoring Buried Pipeline

This case study describes a buried operational pipeline in the Middle-East region that was monitored using a GUL Monitoring System. This pipe was  known to be at risk of degradation from a localized corrosion mechanism. The monitoring allowed the pipeline operators to ensure the inhibitor dosing was correct and that previously active corrosion was arrested. 